Convert pound / cubic yard to tonne / cubic meter

Learn how to convert 1 pound / cubic yard to tonne / cubic meter step by step.

Calculation Breakdown

Set up the equation
1.0(poundcubic yard)=x(tonnecubic meter)
Define the base values of the selected units in relation to the SI unit (kilogramcubic meter)
Left side: 1.0 (poundcubic yard)=5.07.64554857984(kilogramcubic meter)=5.07.64554857984(kgm3)
Right side: 1.0 (tonnecubic meter)=1016.0469088(kilogramcubic meter)=1016.0469088(kgm3)
Insert known values into the conversion equation to determine x
1.0(poundcubic yard)=x(tonnecubic meter)
Insert known values =>
1.0×5.07.64554857984×(kilogramcubic meter)=x×1016.0469088×(kilogramcubic meter)
Or
1.05.07.64554857984(kgm3)=x1016.0469088(kgm3)
Cancel SI units
1.0×5.07.64554857984(kgm3)=x×1016.0469088×(kgm3)
Conversion Equation
5.07.64554857984=x×1016.0469088
Switch sides
x×1016.0469088=5.07.64554857984
Isolate x
Multiply both sides by (1.01016.0469088)
x×1016.0469088×1.01016.0469088=5.07.64554857984×1.01016.0469088
Cancel
x×1016.0469088×1.01016.0469088=5.0×1.07.64554857984×1016.0469088
Simplify
x=5.07.64554857984×1016.0469088
Solve x
x0.00064364686.4365×104
Conversion Equation
1.0(poundcubic yard)6.4365×104(tonnecubic meter)

Cookie Policy

PLEASE READ AND ACCEPT OUR COOKIE POLICY.